2016/07 AIST Iron & Steel Technology July
CFD Modeling To Simulate Gas Stirring Process Using Bottom Plugs in a Steel Ladle
Establishment of Minimum Mold Heat Removal and Control for Continuous Casting
Mold Heat Transfer Behavior at High Casting Speed Over 7.0 m/minute in the CEM®, POSCO
Novel Refractory Plate Sealing Technology
Solution for Continuous Caster DC Motor/Encoder Failures
Understanding the Clogging Phenomenon During High-Al TRIP Steel Casting