1997 Ironmaking Proceedings
A Coke Oven Model including Thermal Decomposition Kinetics of Tar
A Mathematical Model for the Estimation of Flue Temperature in a Coke Oven
A Status Report on the FastmetŪ Process from the Kagogawa Demonstration Plant
A System for Interpretation of Blast Furnace Stockrod Measurements
Altos Hornos de Mexico Blast Furnace No.5 certification in ISO-9002 standard
Analysis of Ammonium Sulfate Circulation Tank Failure-Possible Causes and Their Remediation
Automated Control for Coal Handling Operations at Bethlehem Steel, Burns Harbor Division
Automatic Coke Oven Heating Control System at Burns Harbor for Normal and Repair Operation
Baldwin Thermal Treatment Facility Baldwin, Illinois Organics and Contaminated Soils
Blast Furnace Injection of Low Volatile Coal at Bethlehem Steel's Burns Harbor Division
Blast Furnace Supervision & Control System
Burden Distribution Tests of Siderar's No. 2 Blast Furnace
CC Process Optimization Through an Improved Thermal Modeling of the Cast Steel Products
Changing from 100% Sinter Burden to 100% Pellets in Koverhar
Coke Cake Behavior Under Compressive Forces
Cokemaking from Coals of Kuzbas and Donbas
Cold Bonded Briquettes with High Temperature Properties for Blast Furnace Burdens
Collector Main Replacement at Indianapolis Coke
Consumption of Residual Char in Blast Furnace during Coal Injection- Slag/Carbon/Gas Interactions
Continuous Improvements in Pelletizing, the AHMSA Experience
Continuous Steelmaking: The Balance Between Intensity and Refining
Cyanide Treatment Options In Coke Plants
Development of Quick Repairing Technique for Ceramic Burner in Hot Stove of Blast Furnace
Enhancing Hot Mill Slab Yield, Usage and Throughput using Expert Systems and Numerical Optimization
Extension of Blast Furnace Campaigns at Inland Steel
Gas Treatment and By-Products Recovery of Thailand's First Coke Plant
Glass-Coating and Cleaning System to Prevent Carbon Deposition on Coke Oven Walls
Great Lakes Steel - PCI Facility
Hearth Monitoring Experiences at Dofasco's No. 4 Blast Furnace
Hoogovens Blast Furnace No.6 - the First Eleven Years of a Continuing Campaign
Hot Repair of Ceramic Burner on Hot Blast Stoves at USS/KOBE's #3 Blast Furnace
Hydrochloric Acid Pickling of Coiled Steel Rods
Improvement of Secondary Cooling Control by On-Line Temperature Calculation
Improving Productivity and Quality Through Control of the Steel Temperature in the Tundish
In-plant Recycling of Ironmaking Waste Materials at POHANG Works
Increasing Blast Furnace Productivity - Is There a Universal Solution for All Blast Furnaces?
Increasing the Proportion of Yandi Pisolite in BHP Steel Ore Blends
Long Life Hearth in Blast Furnace Kokura No.2 B. F. of Sumitomo Metals
Low-Coke Rate Operation Under High PCI at Kobe No.3 BF
Metallurgical Applications of Upgraded Coal from the LFC Process
Methods for Reduction of Charging Emissions
Microwave Drying of Ferric Oxide Pellets
Model Based Control of a Coke Battery
Monitoring Lining And Hearth Conditions At Inland's No. 7 Blast Furnace
Operating and Maintenance Benefits of Automated Oven Wall Temperature Measurement
Operation of a Dry-Cleaned and Agglomerated Pre-Compaction System (DAPS)
Process Improvements at Redcar Sinter Plant
Processing High Phosphorus HBI in Steelmaking
Production Improvements in SIDERAR BF # 1
Prolongation Technologies for Campaign Life of Tall Oven
Reactive Phosphide Inclusions in Commercial Ferrosilicon
Rebuild of SSAB Oxelfisund Blast Furnace No.4 and Introducing the ROAX-TOP
Rebuilding of Rautaruukki Blast Furnaces
Recent Improvements in Casthouse Practices at the Kwangyang Blast Furnaces
Reducing Drying/Preheat Cycle Time to Increase Pellet Production at the BHP Whyalla Pellet Plant
Saldanha Steel Project The Zero Emission Philosophy
Simulation of Industrial Coking - Phase 1
Slab Caster Design Criteria for High Quality Steel
Solidification Control versus Liquid Steel Temperature - A Review
Steel Composition and Temperature Adjustment: the HALT process at KRUPP HOESCH - Dortmund Plant
Technical & Economical Considerations of New DRI Melting Process
Temperature Prediction and Control During Continuous Casting
The 2nd Campaign of Pohang No. 2 B.F. & Its Relining Plan for the 3rd Campaign
The Effect of Deoxidiation Praxis on Inclusion Characteristics in Bearing Steel Production
The Formation or an Ore Free Blast Fumace Centre by Bell Charging
The Influence of Sinter Composition on Sintering Rate and Physical Quality of Sinter
The Production Of Iron Carbide
The Recycling of Waste Oxides at Great Lakes Division, National Steel Corporation
The Romelt Process - Prospects for Pig Iron Production in North America
The Videofil Probe, a Novel Instrument to Extend the Coke Oven Service Life
Thermal Modeling as a Tool for Optimization and Control of Casting Processes
Titanium Addition Practice and Maintenance for the Hearths in AHMSA's Blast Furnaces
Up-Grade or Process Control System U.S. Steel Fairfield No.8 Blast Furnace
Western Canadian Cokina Coals - Thermal Rheology and Cokina Quality